Extension and renovation work at the DELTA-PREFA production plant: extension of the roller tracks at the exit of the existing plant and creation of a storage area under a canopy (2700m²).
Creation of a new production hall comprising: production plant (850m²), canopied storage area (2600m²) and crane runways. 20-tonne CMU cranes. Supply and installation of cladding (single and double skin), joinery and storage racks. Work carried out on a busy industrial site.
Delta Prefabrication
Type of work
- Industry
Summary
1
2
Type of service
- Architectural metalwork
- Metal cladding
- Metal framing
- Renovation / refurbishment
Stakeholder(s)
- France Montage
- Gagne
Project owner
Delta Préfabrication
Project manager
AGC Concept
Architect
AGC Concept
Location
Privas (07)
Country
France
Date of delivery
2019-2020
Time of work
1 year
Amount of work
1 240 000 €
Surface built
6 150 m²
Market
Separate lots
Steel tonnage
400 tonnes