Extension and renovation work at the DELTA-PREFA production plant: extension of the roller tracks at the exit of the existing plant and creation of a storage area under a canopy (2700m²).
Creation of a new production hall comprising: production plant (850m²), canopied storage area (2600m²) and crane runways. 20-tonne CMU cranes. Supply and installation of cladding (single and double skin), joinery and storage racks. Work carried out on a busy industrial site.

Type of service
  • Architectural metalwork
  • Metal cladding
  • Metal framing
  • Renovation / refurbishment
Stakeholder(s)
  • France Montage
  • Gagne

Project owner

Delta Préfabrication

Project manager

AGC Concept

Architect

AGC Concept

Location

Privas (07)

Country

France

Date of delivery

2019-2020

Time of work

1 year

Amount of work

1 240 000 €

Surface built

6 150 m²

Market

Separate lots

Steel tonnage

400 tonnes