Construction of a sports hall equipped with a climbing area. Laminated timber frame / Metal trellis / Timber-framed facade. Tiltable building made up of metal lattice gantries, wooden gibbeting, LC and metal façade posts supporting the wooden mantle wall.
Sports hall – Cime
Type of work
                                - Sporting Cultural Leisure
 
Summary
                            
                
                
                1
            
            3
        Type of service
                                - Architectural metalwork
 - Facade / wooden cladding
 - Flooring
 - Laminated timber framing
 - Metal framing
 - Timber frame wall
 
Stakeholder(s)
                                - Briand Bois
 - Briand Métal
 
Project owner
Département de l'Aube
                                    Project manager
Even Structures
                                    Architect
5-CINQ Architecture
                                    Location
Rosières-Près-Troyes (10)
                                    Country
France
                                    Date of delivery
2022
                                    Time of work
8 months
                                    Amount of work
1 565 375 €
                                    Amount of the operation
2 159 139 €
                                    Surface built
4 780 m²
                                    Market
Separate lots
                                    Steel tonnage
430 tonnes
                                    m3 Concrete
1 635 m³